About the project

The lead work was built off-site in our dedicated lead workshop and and then installed on-site over the dorma windows and roof edges. The roof was stripped, felted with permeable felt, and the and reslated with delabole slate.

To learn more about our lead work visit slate visit https://bristowandreeve.co.uk/slate-roofing/