About the project

A complete renewal of a lead valley in Wadebridge, Cornwall. After finding leaks in the lead valley, we stripped the rag slate, lifted up the existing lead and renewed the rotten timber supporting the lead. Then, ensuring the correct overlaps on the lead joints (at least 6 inches, allowing for the capillary action lead has on the overlay) the lead used for the renewal was with code 4 lead.